List of experiments (minimum 10 experiments)
1. Study of types of cables.
2. Study of types of Insulator used in power system
3. Study of Bus –bar arrangement of a power supply sub – station.
4. Study of Synchronous phase modifier and calculation of its rating.
5. To measure the A, B, C, D constants of transmission lines.
6. To measure the A, B, C, D constants of series transmission lines (HV-HV).
7. To measure the A, B, C, D constants of series transmission lines (LV-LV).
8. To measure the A, B, C, D constants of parallel transmission lines.
9. To locate faults in a cable by Murray loop test.
10. Measurement of capacitance between conductor –conductor and conductor –earth.
11. Comparison of conductor Characteristics (Self GMD) between two different groups
of conductors.
12. To find out the rating of capacitor required for improving the power factor of an
inductive load.
13. Study of Electrical power supply system.
14. Study of transmission structure used for different types of power supply system.
15. Study the lay out diagram of college power supply system.
Apparatus required: -
1. Transformer
2. Voltmeter
3. Ammeter
4. Multimeter, Wattmeter
5. Insulators
6. Synchronous motor
7. Capacitor, resistors, inductor
8. Power supply.
Reference Books: -
1. Power system analysis by C.L Wadhava, New Age
2. Power system analysis by V.K Mehta, S. Chand.

Related Posts Plugin for WordPress, Blogger...

GREAT NOVELS HERE!

 
 
 

About Me

My Photo
ELECTRICAL ENGG. - LAKHAN KUMAR PATNAIK
View my complete profile

Quote of the day

Search Engine
Tips for New Bloggers

Word of the day

Make Money Blogging

Subscribe Here!

Enter your email address:

Add to Google Reader or Homepage

Subscribe in Bloglines